Restaurant and Retail Roofing Types in Troy

Roofs Around Kitchen Exhaust Fans
The mechanical code sets the hardware. A grease duct serving a Type I kitchen hood that ends above the roof must discharge at least 40 inches above the roof surface. The exhaust fan has to be positioned so its discharge doesn't hit the roof, and a vertical-discharge fan needs a drain at the bottom of its housing that empties into a grease reservoir. Upblast fans must be hinged so they can be tipped for cleaning, with the duct rising at least 18 inches above the roof. In practice, grease still escapes when reservoirs overflow, filters are skipped or the fan is cleaned on the roof.
The membrane decides how much that grease costs you. The federal guide specification for EPDM roofs says not to use EPDM next to kitchen exhaust discharge, because grease and oil attack it, and one EPDM maker tells installers to keep greases, vegetable oils and animal fats off its sheet. Makers market PVC, and PVC blended with KEE, for food-service roofs. In one maker's 30-day lard immersion test, its standard PVC lost 21 percent of its weight and its PVC KEE lost 12 percent, a lab result the maker itself says does not represent real-world exposure.
Two PVC makers' food-service brochures also say their warranties do not cover grease exposure. A grease-resistant membrane narrows the risk; a containment unit, a sacrificial pad and regular fan cleaning keep grease off the roof in the first place. The membrane itself is covered on PVC roofing.
Grease damage usually shows up on a roof walk. The membrane around the fan curb discolors, and where grease has been attacking it the sheet can feel soft or look swollen next to clean membrane a few feet away. Grease also runs with rainwater toward the nearest drain, so the damage often trails away from the fan in a stripe. If you see that pattern, have the fan and its reservoir checked before the roof is patched, or the patch will fail the same way.

Storefront Parapets, Canopies and Sign Penetrations
Front parapets on retail buildings carry sign raceways, lighting and bracket bolts driven through the coping and the wall. Each fastener is a leak path into the wall, and the water often shows up inside the storefront, not on the roof. Canopies and awnings over entries add their own small roofs and their own wind exposure: on June 5, 2024, storm reports logged a gas station canopy collapsing onto cars near Farmington in Oakland County. Coping and parapet details are covered on roof flashing repair.

Rooftop Refrigeration for Coolers and Freezers
Restaurants and grocery tenants put walk-in cooler and freezer condensing units on the roof, with refrigerant lines dropping through pipe boots or pitch pans and condensate draining onto the membrane. Service techs walk the same path every visit. In winter that condensate can freeze into a sheet of ice right on the service path, since Detroit's normal lows sit below freezing from December through March. Ask for condensate piped to a drain, equipment on rails high enough to reflash under, line sets through proper boots rather than sealant-filled pans, and walkway pads to each unit.

Why Troy building owners call Troy Commercial Roofing
- Free, no-obligation roof assessment and estimate
- Written scope and price before any work starts
- One local commercial roofing contractor per request, not a call list
- No charge to building owners for the referral
Scheduling Roof Work Around Opening Hours
Restaurants and stores make their money while the roof crew would like to be working, so the schedule gets negotiated:
Early starts and early finishes
on noisy tear-off days, with quieter detail work during service.Adhesive and primer odors
The mechanical code already keeps grease exhaust at least 10 feet sideways or 3 feet above any air intake. That rule covers grease exhaust, not roofing adhesive, so ask how fumes will be kept away from rooftop unit intakes while dining rooms are open, and whether low-odor products are available.Kitchen fan shutdowns
Reflashing an exhaust curb means the hood is off, which usually means after close.Parking and deliveries
Dumpsters and lifts placed away from entrances and delivery doors.Seasonal peaks
Retail's holiday rush lands in November and December, just as Detroit's snow normals start to climb (1.9 inches in November, 8.9 in December). A reroof planned for late spring through early fall avoids both the busy season and the snow.
Restaurant and Retail Roof Bid Questions
Membrane at the kitchen fans
Which product, and the maker's written statement on grease exposure.Grease containment
The unit or pad being installed under each fan, and who maintains it.Warranty exclusions
Ask for the grease and chemical exclusions in the warranty to be pointed out in writing before you sign.Coordination with HVAC and hood contractors
Who disconnects and resets rooftop units and exhaust fans.Tenant breakouts
Costs split by unit for a multi-tenant roof.Sign and canopy work
How sign brackets will be reset and sealed after the roof is done.
Use the form to tell us the type of business, the number of kitchen fans and what's leaking. We forward it to one independent roofer, who sets a visit outside your busiest hours.

